Monday 3 July 2017

A post about posts

Trench 1 was set out on Saturday morning and posts put in place ready for topsoil stripping next Saturday. We have positioned the trench over an area that will hopefully pick up a series of features in a 10m x 10m square. We also established a TBM (Temporary Bench Mark) and the site is 101m AOD (Above Ordinance Datum). Next week is make or break.